This information pack applies to embedded generator connections that will follow the connection process regulated by Chapter 5 of the National Electricity Rules (NER). In general Chapter 5 applies to generators that have a capacity greater than 5MW and that will be registered with AEMO.
Application guides, pro forma design and connection contracts, Network Standards and other information included in this information pack are available from the drop down links below. The Registered Embedded Generators Guideline provides a directory to these documents.
Further information and details on how to apply are provided below. If you have a technical or general enquiry please email eg@ausgrid.com.au.