Thank you for your ongoing patience as we work to restore power to the remaining customers impacted by Wednesday's storm. Restore times will be added to the website where information is available. Read the latest update.

Technical Documentation

Technical drawings NS125

Technical drawings provide supporting documentation for Ausgrid's Network Standards.

186336-1   LV ABC Parallel Circuit Bonding Arrangements

206544-1   LV ABC Intermediate Construction on 500mm Standoff Bracket for 0° to 30° Deviation Angle 1-80

206546-1   LV ABC Intermediate Construction on 500mm Standoff Bracket for 30° – 60° Deviation Angle 1-83

206623-1   LV Open Wire to ABC Through Termination Construction with Links 1-89

206624-1   LV Horizontal Pin Construction with LV ABC Tee Off Construction 1-84

228823-1   HV, LV and Communications Crossarm Details

232175-1   LV ABC Offset Arm Construction for 0° to 30° Deviation Angle 1-81

234378-1   LV Through Termination 1-11 (A) For Maintenance And Legacy Replacements Only

244670-1   LV ABC Twin Offset Crossarm Termination Construction 1-82

251901-1   LV Conductor Termination Tie for Twin and Twist Conductors

251902-1   LV Conductor Side Tie for Twin and Twist Conductors

251903-1   LV Conductor Top Tie for Twin and Twist Conductors

513900-1   LV Horizontal Pin Construction 1-1

513901-1   LV Offset Arm Arrangement 1-2

513902-1   LV Angle Construction 1-3

513903-1   LV Termination Arrangement 1-10

513904-1   LV Through Termination Arrangement 1-11

513905-1   LV Corner Pole 4 way Through Construction 1-13

513906-1   LV Corner Pole (Tee-off) Termination Arrangement 1-14

513940-1   LV Corner Pole Termination Arrangement 1-12

513945-1   LV Railway Termination Construction 1-15

513962-1   LV Through Transposition Termination Construction 1-16

513971-1   LV Through Mains with Links 1-50

513981_1   LV ABC Intermediate for 0° to 30° Deviation Angle, 1-70

513981_2   LV ABC Intermediate Parallel Bonding Construction for 0° to 30° Deviation Angle, 1-70B

513982-1   LV ABC Termination Construction, 1-71

513983-1   LV Open Wire to ABC Through Termination Construction, 1-72

513995-1   LV Insulator and Pin Arrangement

514012-1   LV ABC Intermediate Construction for 30° – 60° Deviation Angle 1-73

514013-1   LV ABC Through Termination Construction 1-74

514013-2   LV ABC Through Termination Parallel Bonded Construction 1-74B

514014-1   LV ABC Corner Pole Construction 1-75

514015-1   LV ABC Through Mains Corner Construction 1-76

514016-1   LV ABC Through Termination Construction with Tee off 1-77

514017-1   LV ABC Intermediate Construction with Tee off 1-78

514052-1   LV ABC Through Termination Construction with Links 1-79

244670-1   LV ABC Offset Twin Arm Construction For 0° to 30° Deviation Angle 1-82    

565720_1   LV ABC Constructed on Conductive Poles Below High Voltage Supply